Utility District Services

As Project Manager for your utility, we will work hand in hand with your Board of Directors as well as your consultants in achieving a common goal which is to optimally run your utility at a cost-effective rate. As all trained utility professionals learn early on in their careers, budgetary constraints can either make or break a utility. Having a seasoned and skilled management team on board that has dealt with many challenging and difficult situations over the years can truly be a huge asset during these trying economical times. Our main focus is directed towards accountability and responsiveness to our clients' needs and we pride ourselves on being accessible as needed 24/7.

Specialized Services

 

If water loss is a concern for your District, we are capable of conducting thorough evaluations of your system which include on site water distribution inspections, aerial surveys of undeveloped tracts, and administrative review of billing and accountability practices. Not only is water considered revenue for your Utility but it is also a precious resource that must be preserved and protected accordingly.

We have assisted MUDs in applying for special parks and recreational trail grant funds, working with various environmental advocates such as the Greens Bayou Corridor Coalition (member), the Harris Galveston Subsidence District WaterWise® program (sponsor), AWBD WaterSmart® program, and Harris County SWIM program.

We have also been instrumental in assisting various clients in setting up District websites (www.parkwayud.org) as well as the implementation of emergency communication systems to alert and inform their constituents of critical weather disasters or system failure information should they occur. We are very active in creating as well as participating in disaster preparedness plans and were very instrumental in preserving the potability of numerous water systems during Hurricane Ike in September 2008. We are strong proponents of emergency auxiliary power systems and have numerous resources that may prove beneficial to your system whether your plans are to design and construct future generator systems or service and maintain current equipment.